How the ACT applies the standard
The ACT applies AS 1926.1 to new pools through building approval. No register or certificate cycle currently operates (reform has been discussed), so compliance shows up in two places: the approval when a pool is built, and the building and compliance report every ACT sale contract requires.
ACT specifics worth knowing
- New pools, spas and barriers need building approval with the barrier certified
- Pre-sale building reports cover the pool area - defects surface before exchange, not after
- Older pools are assessed against their era; new barrier work meets current rules
- The 300mm rule captures spas and portable pools
The rules in detail
The rule guides describe the standard the ACT applies: heights and gaps, gates and latches, glass fencing, boundary fences, CPR signs and spa rules. Territory overview: ACT pool rules.